← All generation

Reservoir + run-of-river

Hydro

Conventional hydro is concentrated in Scotland and Wales; pumped storage is listed separately to avoid double counting.

Hydro · installed / connected capacity1.91 GW

Conventional hydro only at end-May 2026.

↯Hydro output
—Loading

Loading the latest Elexon readings…

Net energy · 24h—

Estimated from half-hourly readings

Mean output · 24h—

Average transmission output

Peak output · 24h—

Highest half-hourly reading

Live power flow

Hydro generation output

Half-hourly transmission-system readings from Elexon.

Loading the latest Elexon readings…

30-day average

Typical hourly output

Average MW
Loading 30-day profile

Combining the latest 30 days of half-hourly readings.

Loading operational outages…

Location map

Operating sites

The full operational DUKES register is fetched, mapped and cached by our Cloudflare Worker.

Loading…reading the official register
—capacity at mapped sites
DESNZ DUKES 5.11 ↗
5selected locations shown
Hover, tap or focus a marker
Coastline: Natural Earth · public domain

Historic daily comparison

Last seven days

Electrical energy generated each day.

Daily energy calculated from Elexon FUELHH half-hourly readings; today is accumulated so far.

Individual locations

Largest and selected sites

Installed power capacity and location from the latest official list.

5 shown
SiteTypeRegionPower
SloyLarge hydroScotland152.5 MW
GlendoeLarge hydroScotland100 MW
ErrochtyLarge hydroScotland75 MW
FasnakyleLarge hydroScotland69 MW
LochayHydroScotland47 MW
Capacity & sitesDESNZ DUKES 5.11
Snapshot dateEnd-May 2026
Live & historyElexon FUELINST / FUELHH